Flooring quantity & budget
Calculate coverage, whole packs and a material-plus-labour budget.
Quantity / scenario planning · Reviewed 7 October 2026Your inputs
Check all starting values against your project and product. Enter your own prices; keep costs on the same GST basis.
How to prepare your inputs
Measure net floor areas and pack coverage. Decide waste with your installer based on board direction, patterns and cuts.
How this calculation works
Required coverage = area × (1 + waste / 100). Packs round up. Budget = packs × pack price + net area × installation rate + extras.
24 m² plus 10% waste needs 26.4 m². At 1.5 m² per pack, buy 18 packs.
Assumptions & exclusions
Use your supplier’s pack coverage. Installation is charged on net area. Extras can include preparation, adhesives, trims and disposal.
Your next step
Confirm underlay, moisture testing, trims, preparation and installation inclusions with your flooring contractor.
Further reading
- Bunnings Trade planning resources
These resources provide background information. Confirm current product specifications and project requirements with your supplier or trade professional.
What if my shape or product is different?
Use dimensions and product data that match the stated method. For complex work, calculate separate sections or obtain a project-specific take-off. Do not apply simple geometry to structural or compliance decisions.
Why are quantities rounded up?
Whole bags, packs, sheets or cartridges round up to purchasable units. Decimal area or volume results are planning figures; confirm order increments with the supplier.
Are my entries saved?
No. Entries remain in the current browser page and clear on reload. Printing can save your results and inputs as a PDF on your device.
Keep planning
Concrete volume & budget
Work out slab volume, an order allowance and your installed budget.
Open calculator PaintingPaint quantity
Plan paint litres from surface area, coats and product coverage.
Open calculator TilingTiling quantity & budget
Calculate coverage, whole packs and a material-plus-labour budget.
Open calculator